2001
- The first year
|
|
|
Motors
in Filter Box, Shell Heater System |
|
|
DE,
DS, Compressor |
|
|
Cryovac
Test Chamber (CTC) |
|
|
Preparing
for first cold test |
|
|
CTC |
|
|
First
cold test, other bench testing |
|
|
CTC |
|
|
Prep
for second cold test, motor/brake camera unit |
|
|
CTC,
Warm Bulkhead |
|
|
2nd
cold test, cryovac test chamber |
|
|
Mimir
Mock-Up |
|
|
Filter
Wheels in Filter Box, Slit Belt Unit |
|
|
Warm
Bulkhead, Slit Belt Unit |
|
|
Detector
Mount |
|
|
Big
Ben, G10 Collar Fab. |
|
|
MKIR
Detector Socket & Mount
|
|
|
G10
collar, Cold Mass, Cold Shield
|
|
|
Lens
Inspection |
|
|
G10
collar complete, Filter Box bulkheads, "Big Ben"
|
|
|
Camera
Block begins |
|
|
G10
collar gets epoxied into Big Ben |
|
|
Camera
block machining, refrigerator cold strapping
incomplete
|
|
|
G10+Big
Ben, forward thermal shield, LN2 loop, cold bulkhead |
|
|
|
|
|
First
vacuum test, first cryostat assembly |
|
|
|
|
20010719
|
More
leak testing in SIF |
|
|
|
|
|
Cryovac
test chamber
|
|
|
|
|
|
Filter
Box before being sent out for dip brazing |
|
|
|
|
|
Bare
MUX, FWs, LN2 loop |
|
|
|
|
|
More
prep for brazing |
|
|
|
|
|
Cold
bulkhead with LN2 loop, Filter box after brazing, POL
wheel and cell operation |
|
|
|
|
|
Filter
Cells, Filter Wheels, Big Ben |
|
|
|
|
|
Warm
and Cold bulkheads epoxied together, filter cells worked |
|
|
|
|
|
Delivery
of cryostat by/from BU SIF, pics of SIF guys. |
|
|
|
|
|
Mimir
in lab for first time, mold for MLI frame, measuring detector
ribbon cables |
|
|
|
|
|
Filter
Box and Mimir side views |
|
|
|
|
|
Marc
Buie's first visit, inside views |
|
2002
- Year Two
|
|
|
|
|
|
G10
MLI shell, Mimir as R2D2 |
|
|
|
|
|
Wrapping
MLI on the G10 shell |
|
|
|
|
|
Filter
Wheel Stack, Pumping MLI |
|
|
|
|
|
Degreasing
Stepper Motors |
|
|
|