Mimir - Fabrication History and Pictures

Below are a set of links to a chronological ordering of the pictures taken of Mimir as it was fabricated and changed via operations servicing efforts. All photos are by Dan Clemens unless noted.

Year
Fabrication
Large structures fabrication, initial assembly, lab testing
Camera block, optics; initial cold testing
Optical units fabrication and assembly; more cold testing
Slit/Decker unit; full integration and lab testing; delivery to Arizona
Operations
Major servicing, with changes to detector cooling, pupil mask, and thermal shield
2006
 
2007
 
2008
 
2009
 
2010