|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
STEP 2: LOADING CHASSIS ONTO AN EMPTY HOLDER
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The production process proceeds with the loading of a Chassis onto an empty Holder at the Chassis Loading Station (shown in Figure 3).
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Figure 3: Holder approaching the Chassis Loading Station
|
|
|
|
|
|
|
|
|
|
|
Main Conveyor Belt transfers an empty Holder to the Chassis Loading Station
A supply of Chassis is available at the Chassis Input Buffer (shown in Figure 3).
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Figure 4: Chassis Loading Station
|
|
|
|
|
|
|
|
|
|
|
Light Sensors detect the presence of an empty Holder at the Chassis Loading Station, as well as a Chassis in position to be pushed onto the Holder.
Empty Holder is lined up in precise position by means of the Input Gate and the Output Gate (see Figure 4).
Pushing Arm pushes Chassis onto Holder as shown in Figure 4.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|