STEP 2: LOADING CHASSIS ONTO AN EMPTY HOLDER

The production process proceeds with the loading of a Chassis onto an empty Holder at the Chassis Loading Station (shown in Figure 3).

Figure 3: Holder approaching the Chassis Loading Station

  • Main Conveyor Belt transfers an empty Holder to the Chassis Loading Station

  • A supply of Chassis is available at the Chassis Input Buffer (shown in Figure 3).

Figure 4: Chassis Loading Station

  • Light Sensors detect the presence of an empty Holder at the Chassis Loading Station, as well as a Chassis in position to be pushed onto the Holder.

  • Empty Holder is lined up in precise position by means of the Input Gate and the Output Gate (see Figure 4).

  • Pushing Arm pushes Chassis onto Holder as shown in Figure 4.

Home

Continue